S14-17-11 17/11
PLENUM MEETING
Marthe, Samyra, Pieter + Miljan online


Meetups
KITCHEN CHECK UP -  7DECEM morning 10.30 - Samya, Marthe, Miljan
MEDIA CAVE - 14/15 dec (sanding beams) - Marthe
MEDIA CAVE - 18 dec (late afternoon)
TOPFLOOR - measure topfloor, make plans (end of january)

To do list 

topfloor
- windproof window (Miljan > isolation is in a blue box in the cellar)
- CO detector ? (koolstof-monoxide)

kitchenette
- ventilation flap
- gaz - stoaf - investement  ??-  (franks: ask him the problem  again - - - raf checks?)
- replace lamp fridge (samyra)
- hanging system - metal stick  (pieter has 2m's of metal sticj...?)

Kitchen
- buy fridge.. extending.. deadline - using back room for cooling  
- construct shelves*

Mediacave;
- arrange tools ( sanding machines, dremel, ....) 
- ceiling lack / beits - wittisih 
*- test
*- 1 day sanding
*- 1 day painting
-  hennep walls ( check with matthias > called but didn't pass by )
- door flaps (buy screws +maps)  DONE
- colour surfaces
- colour hallway
- we don't invest in dryer _  for drying go to washing saloon /private room
- wood: move to the back? DONE hydraulic axe?

ground floor
- bell system - parlophone ( manual) - perlofoonspecialist contacted
- electricity finish 
- electrical scheme
- doorhandel (samyra)
- isolation 
- varnish door ? do test black mdf  (any trace of glue on MDF will make dirty streaks ...)
- frame window  DONE
- tape door
- door brushes DONE
- wooden stick on chimney

To Buy
More ledlamps
CO detector
 
* - re-cup °AIR (?) possible dates to check out left over furniture/ shelves/ materials, starting tomorrow (-: ...